Thursday, January 10, 2008

Our bat base are belong to us.

The tricky parts of this (other than, you know - actually creating all the little bits) is working within the space contained by this display case and working front to back until we get ready to turn everything around later. We wanted a platform base to give elevation for a grotto for the batboat, and to hopefully house electrical parts.

We tried to drop in a full-length base platform but I realized it would be better with two smaller ones so we can have flexibility and maneuvering room. Here we are laying out the new floorplan and test-fitting the underflooring. You can see our markings for where the grotto will be.



Labels: , , ,

Thursday, January 3, 2008

Back to work.



After a long break, we are back in full force for the new year working on the batcave project. Alex draws up some plans for the chem lab tables.

Labels: , ,